Published On Jan 6, 2024
A tutorial on how to build the PECO SS32 Occupational Bridge Kit.
Bonus Content: / @thatmodelrailwayguy
MERCH: https://shop.thatmodelrailwayguy.com
In the previous video I covered how I build the embankment module on the modular model railway but one part I skipped over was the construction of the bridge kit. That's because I felt it deserved a video of it's own as, having had a look around online, it doesn't seem like anyone has covered how to build the SS32 Occupational Bridge Kit from Wills & PECO.
This is a perfect project for beginners and experts alike and in this video I'll cover how to put the whole kit together along with some tips on painting it for a great finished result. I'll even cover how I installed it on the layout though if you want to see that process in more detail, I would recommend checking out Episode 24 of Building A Modular Model Railway:
While the SS32 Kit is to construct a double track occupational bridge, the process is very similar for SS28 which is the single track version. Either way I hope this might help those looking at purchasing and building this kit in the future.
Products Used:
SS32 Occupational Bridge Kit: https://amzn.to/48rUNZ2
Revel Glue: https://amzn.to/4aDHIgF
Cream Paint: https://amzn.to/3S6Yq0H
Railmatch Sleeper Grime: https://www.hattons.co.uk/341901/rail...
(The above may contain affiliate links which help support the channel at no extra cost to you)
Chapters:
00:00 - Intro
01:04 - Constructing The Kit
05:01 - Painting The Kit
07:38 - Installing On The Layout
Thanks for watching 😃