Published On Aug 28, 2023
OXBO recently helped install a new 1.8 million pound railroad bridge. The overall scope of the accelerated bridge installation consisted of:
-Lifting the new bridge to install OXBO’s 300 ton skid gear system.
-Removing the existing bridge from its foundations to make room for the new one.
-Skidding the new bridge into place.
-Jacking the new bridge down to elevation and aligning atop the new foundations.
All of which had to happen within a 36 hour outage window!!!
OXBO utilized several pieces of equipment to execute the scope at hand including:
-4-300 ton skid shoes, propelled by a hydraulic push/pull system.
-A unified jacking system.
-An assortment of high capacity jacks varying in heights to achieve a low ending elevation.
The project was completed without incident or injury and ahead of schedule.