Kelana Jaya Line - Timelapse
Naven Kumar Naven Kumar
345 subscribers
31,064 views
0

 Published On Oct 10, 2020

The LRT Kelana Jaya Line is the fifth rail transit line and the first fully automated and driverless rail system in the Klang Valley area and forms a part of the Klang Valley Integrated Transit System. Servicing 37 stations, the line has 46.4 km of grade-separated tracks running mostly on underground and elevated guideways. Formerly known as the PUTRA LRT, it is currently operated by Rapid Rail, a subsidiary of Prasarana Malaysia. Construction began in 1994, about the same time as construction of the Ampang Line. The tunnels were constructed by Hazama Corporation and Hyundai E&C.[3] Operation commenced on 1 September 1998 between Subang Depot and Pasar Seni, with phase two, Pasar Seni to Terminal Putra, on 1 June 1999.[4]

In 2002, the line carried its 150 millionth passenger, with an average of 160,000 passengers daily.[5] Today, it carries over 250,000 passengers a day and over 350,000 a day during national events.[6]

The line underwent a 17 km extension with construction commencing in early 2010 through to 2016. With 13 new stations to the line, the new terminus is now at Putra Heights, extended from Kelana Jaya

show more