Inside the engineering megaproject that went horribly wrong | Four Corners
ABC News In-depth ABC News In-depth
1.53M subscribers
1,932,709 views
0

 Published On Oct 23, 2023

Australia’s Snowy 2.0 was sold as a nation-building megaproject for a low-carbon future – and was meant to be feeding power into the grid by the end of 2024.

Instead, the pumped hydro project, which was once estimated to cost $2 billion, is four years behind schedule and now forecast to hit $12 billion.

In this documentary, Four Corners reveals the inside story of Snowy 2.0 and how it all went so horribly wrong.

Reporter Angus Grigg challenges its founding champion, former prime minister Malcolm Turnbull, who says as much as $2 billion of the cost blow out can be traced back to a massive tunnel boring machine called Florence.

Florence is currently stuck.

Read more about this story here: https://www.abc.net.au/news/102995568

This episode was originally broadcast as ‘Tunnel Vision’ on 23 October 2023 on ABC TV and ABC iview.

Four Corners is Australia’s premier investigations documentary series.

Subscribe to the Four Corners weekly newsletter here: https://www.abc.net.au/news/subscribe

Follow us on Facebook:   / abc4corners  

#4Corners #ABCNewsIndepth #ABCNewsAustralia

Note: In most cases, our captions are auto-generated.

show more

Share/Embed