Gas Pipe Bonding Requirements, NEC 2020 - [250.4(A)(4)], (12min:16sec)
MikeHoltNEC MikeHoltNEC
108K subscribers
47,088 views
0

 Published On Sep 24, 2021

What are the NEC requirements for bonding of gas piping systems? What other than NEC requirements are involved in bonding metal gas piping? Metal gas piping must be bonded to the circuit equipment grounding conductor if there likely to become energized. However, many AHJ’s throughout the country enforce the metal gas piping to be bonded with an additional bonding jumper in accordance with the National Fuel Gas Code.
For over 40 years, Mike Holt Enterprises has been providing quality electrical code training to help electrical professionals learn the code, prepare for exams, and improve their electrical knowledge. Visit https://www.MikeHolt.com for exam preparation tips and training, instructor and curriculum support, continuing education options, free videos and graphics, and so much more.

show more

Share/Embed