Published On Mar 3, 2023
Video simulation (run time 27:31) for real-time Artemis mission starting with the Gateway lunar flyby. Followed by the lander undocking from gateway continuing to the lunar surface with the lunar descent. Artemis Surface:
- Day 1: Connecting ridge LTV teleoperated traverse standby site to landing site.
- Day 2: IVA Day
- Day 3: Connecting Ridge sample collection, LTV Crewed Traverse, Landing site to bear paw, VR video with human in the loop.
- Day 4: Connecting Ridge EVA at landing site.
- Day 5: Connecting Ridge LTV Crewed traverse landing site to potential habitat site.
- Day 6: IVA Day
- Day 7: Connecting ridge LTV teleoperated traverse standby site to landing site.
Includes distance vs time plot data.
Heard through: https://twitter.com/jenakuns/status/1...
Source: https://ntrs.nasa.gov/citations/20230...