Installing 300 Amps of Solar Charge Controllers
DavidPoz DavidPoz
232K subscribers
17,294 views
0

 Published On Mar 16, 2024

I'm installing 3 solar MPPT charge controllers into my Schneider off grid system. Each of these MPPT charge controllers can accept up to 600 Volts from the PV array, and charge the battery at 100 Amps. Schneider is known for it's industrial equipment, and these charge controllers are no different. These can run at full load (100A) continuous in an environment up to 40°C (104°F).
---------------------------------------------------------------
Signature Solar affiliate links:
Please use discount code DAVIDPOZ at checkout.

Schneider 600/100 MPPT Charge Controllers: https://signaturesolar.com/schneider-...

Schneider PDP (Power Distribution Panel): https://signaturesolar.com/schneider-...

Schneider 6848 XW PRO inverter: https://signaturesolar.com/schneider-...

Chargeverter, 100A charger: https://signaturesolar.com/eg4-charge...

Schneider 125A circuit breaker: https://signaturesolar.com/schneider-...

Schneider off grid bundle inverters and charge controllers: https://signaturesolar.com/bndl-dc-co...
-------------------------------------------------------------
Amazon Affiliate Links:

6-32 1/4" screws for circuit breaker: https://amzn.to/3IGJVLs

Solar disconnect switch (Square D, HU361): https://amzn.to/4adAejb

SPD, Surge Protection Device, Midnite Solar, 600VDC: https://amzn.to/4af2WjN

Ring terminals, 1/4" x 2AWG: https://amzn.to/49RjVJa

Temco Hydraulic crimper: https://amzn.to/3vkObwY

“As an Amazon Associate I earn from qualifying purchases.”
--------------------------------------------------------------
2AWG Ferrule: https://www.ferrulesdirect.com/collec...)

Flexible, UL wire, 2 gauge: https://www.wireandcableyourway.com/2...
-------------------------------------------------------------
Disclaimer:
My videos are in no way intended to be instructional "how-to" lessons. I am simply documenting my project for informational purposes. Property damage, personal injury, or death may result, even when following manufacturer's instructions. I cannot be held liable for such damage or injury. It is YOUR OBLIGATION to ensure that you are complying with any local and federal laws as well as code and permit requirements.

David Poz, LLC

show more

Share/Embed