How to Assemble the Shapeoko 4 CNC Router
Carbide 3D Carbide 3D
42.9K subscribers
39,597 views
0

 Published On May 3, 2021

A primer on the steps required to build the Shapeoko 4.

Build Notes:
- In the last box ("Controller") there is a small bag of extra/spare fasteners. If you are missing a screw, check there for a replacement first.
- V-Wheels will be black on production machines.
- When you are installing the drag chains, there are plastic spacers that get installed under the drag chain tails.
- The Y-Axis homing switch trigger (cylindrical piece with one threaded end) needs to be installed manually onto the back of the right gantry endplate.

-----

Video summary:
0:00 - Intro
0:57 - Assemble Hybrid Table Base
2:30 - Mount the Y-Axis Extrusions
3:15 - Install Gantry
3:42 - Install Endplates
4:20 - Squaring the Frame
6:19 - Hanging the X-Axis Carrier Plate, Adjusting V-Wheels
7:40 - Running the GT2 Belts
9:09 - Mounting the X-Axis
9:41 - Running the "Data" Drag Chains
10:59 - Mounting the Router & Drag Chains
12:56 - Installing the Hybrid Table Slats
14:02 - Installing the Controller & Cable Management
14:43 - Software Initialization

show more

Share/Embed